BicyclesRidley's new headquarters: report of the inauguration
The Sept. 16 was officially inaugurated the new headquarters Ridley in Belgium. Here is the full report of the event
The new Ridley's office is located in Paal-Beringen and spread over an area of 13,500 sqm. Since the establishment is structured on two levels, the total operational area is 27,000 sqm. The new office, then, has the environmental certification of zero emissions into the environment through the roof entirely covered with photo voltaic panels which provide energy production exceeds that required operational capability of the seat; the excess energy is fed into national grid. The new premises are more space all offices and departments operating by Ridley. The new show room and then all the administrative and executive offices, then the research and development department, the art department, marketing department and then the more operational: the painting department, quality control, assembly and finished product storage, and warehouse, with parts and components to be assembled. In the new location every department can count on a larger surface area and improved production efficiency, both in terms of working capacity and quality of the finished product. The new spaces, then, allowed for a strengthening of research and development department, the installation which is not yet complete as the new venue will also be made a wind tunnel. This project, already under construction will be the only home to Ridley cycling world to be equipped with its own wind tunnel in which to study the aerodynamics of their models. Significantly increased, then the painting department, with new and modern stations, but where the paint is still handcrafted in a completely handmade. Even greater was the development of the stock, especially as regards the management of orders. Now all retailers Ridley, through their access code can know in real-time availability in the store of available models (including colors, sizes and assemblies) and carrying out online orders and reservations. In this way Ridley is able to guarantee the shipment of products in stock within 48-72 hours from receipt of order, depending on the time and place where you placed the order itself. At the opening night of the new structure fully operational since weeks, were present in addition to all the staff Ridley, journalists from around the world, the maximum political offices in Belgium, in particular the Mayor of Paal-Beringen and Prime Minister for Economic Development. In the opening speeches, the Mayor has long talked about the importance of the new headquarters for the economic development of Ridley, Ridley thanked the leadership that he chose his city for an investment of over 2 million Euro, although Paal Beringen isn’t a tax haven. Same thought the Belgian Minister, who stressed the importance of investments made by Ridley in Belgium. Both positions have also done their best wishes to Ridley to continue their success in business. They took the floor to the top of Ridley stressed the great effort made to build the new headquarters and its strategic importance to Ridley. Ridley wants to continue its growth in Europe, but especially in the U.S., where Ridley is increasingly asserting the objective is to reach and exceed the major brands more popular in the USA. This ambitious plan of development is the creation of the new structure, which is needed to better support the new dealer, with a higher speed in order processing and even greater ability to manage orders Ridley always in increasing numbers. Then the new structure has enabled a marked improvement in production capacity and product quality, two elements critical to the development of Ridley. Another important aspect is the strengthening of research and development department, which has absorbed, and is absorbing many energies, but that is considered strategic and vital by Ridley, needed to create new models for art style, graphics and technology. Just Technology Ridley we looked long stressing that Ridley has become a leader in some specific aspects of the design of bicycles, such as aerodynamic research before Ridley wants to maintain and increase, not only as regards the study of aerodynamics, but also other technical aspects of the construction of a bike. The evening were then present all athletes team Telenet Fidea Cyclocross. Among the most beautiful gifts, to Shimano, a painting depicting a victorious athlete Ridley reaches the finish line, with its Ridley with Shimano. The evening ended with a musical show and a rich buffet.
|
